About

Integrate Engineers Pte Ltd was incorporated on 06 Feb 2013. The main shareholders are Samwoh Corporation Pte Ltd and HHK Delta Corporation Pte Ltd. The company has an issued share capital of 3m shares with a paid up capital of S$3.5m. Our main core business activity is the installation of 22kV, 66kV, 230kV and 400kV power cables. We are a proven partner of major players in the power industry such as LS Cable & System Ltd, Iljin Electric Co. Ltd, GE Grid Solutions Pte Ltd and J-Power Systems Corp.

Services

✅Power Cable installation up to 230kV, 2500mm2
✅Testing and commissioning of cables up to 400kV
✅Switchgear and transformer maintenance up to 22kV
✅Supply and installation of temporary supply up to 22kV

Projects

As a proven partner of major power industry players, we have extensive track records in installation, testing and commissioning of power cables and equipment. Our business model is to provide complete solution in more complete solution in transmission voltage cable installation and commissioning work.

Who We Are

We are a young and growing company. The company started out in civil works with around 70 employees. Today we have grown to over 220 employees. We react quickly to changes in the economic climate and make the necessary adjustments. We are committed to using technology to increase our efficiencies. This includes using an ERP system and using AI to automate repetitive and mundane tasks so our talents can be utilised to do more meaningful work. Our IT team develops Apps to help us improve our workflow. We invest in equipment that can help our workforce work more efficiently and safely.

Mission Statement

To play a part in powering the future of Singapore by providing transmission cable installation expertise to the power industry. We can deliver such services to our clients in accordance to the highest safety and quality standards set by our clients.

Vision

Integrate Engineers seeks to ensure that her people are equipped with the best knowledge, equipment and are motivated to provide the level of efficiency, quality, safety and reliability expected of us.

Values - HEART

Safety - The personal safety and health of our employees, stakeholders and environment is our responsibility.
Integrity - To uphold the integrity of the company by take ownership of our work and conducting our business with moral character and honesty.
Synergy - Inwards, with teamwork, the whole is greater than the simple sum of its parts. Outwards, we aspire to create value of our business partners.
Humility - Learn from our mistakes and successes and to never stop investmenting in the development of our people.
Care - We show concern for each other and provide welfare in a fair manner, believing that happy employees will produce excellent work.

Commitment





✅Corporate Governance
Whistle Blowing
PDPA Personal Data Protection Act
Code of Conduct / Anti Corruption
🪴Green Initiative
Solar
EV Charging
👷Safety
Fire Drills
PPE Compliance

ServicesCable Installation

Proven Track Record

As a proven partner of major power industry players, we have extensive track records in installation, testing and commissioning of power cables and equipment.

Our business model is to provide a more complete solution in transmission voltage cable installation and commissioning work.

Currently, there exist standalone cable installation contractors, cable jointers and cable testers. By offering services under one company, we want to achieve more synergy between different stages of the work and achieve greater efficiency, resulting in more competitive pricing.

TRACK RECORD AND ON-GOING PROJECTS

Taihan Cable & Solution Co., Ltd   Jul 2025 – Sep 2028
Project: SP POWERASSETS Contract No. 9250322.
Description: 400kV power cables installation work.
Status: On-going 
Location: West Jurong Island to Pacific Light Power Station Route A1 & A2.

Taihan Cable & Solution Co., Ltd   Mar 2025 – Mar 2028
Project: SP POWERASSETS Contract No. 9240422. 
Description: 230kV power cables installation work Term Contract.
Status: On-going 
Location: Various Locations.

Taihan Cable & Solution Co., Ltd   Dec 2024 - Oct 2029
Project: NDC373 Route A. 
Description: 400kV power cables installation work.
Status: On-going 
Location: West Jurong Island Shaft – Shipyard Shaft for West Jurong Island – Rangoon No. 1 Section B Single Circuit.

CIWE Pte Ltd   Dec 2024 - Jan 2028
Project: NDC373 Route D.
Description: 400kV power cables installation work.
Status: On-going 
Location: West Jurong Island Shaft – Shipyard Shaft for West Jurong Island – Rangoon No. 2 Section B Single Circuit 5km.

Taihan Cable & Solution Co., Ltd  Feb 2025 – Dec 2029
Project: NDC357 Route A2.
Description: 400kV power cables installation work.
Status: On-going 
Location: 400kV Labrador – WIPE No.1 Single Circuit 7km.

Taihan Cable & Solution Co., Ltd  Feb 2025 – Dec 2026
Project: NDC373 Route C.
Description: 400kV power cables installation work
Status: On-going 
Location: 400kV Labrador – Rangoon No.1 Single Circuit 6.6km.

Iljin Electric Co., Ltd  Jun 2024 – Oct 2026
Project: NDC369 Route D.
Description: 230kV power cables installation work.
Status: On-going 
Location: Labrador II - Ayer Rajah II Single Circuit 8.8km.

Reynard High Voltage Solutions  Jun 2024 – Nov 2024
Project: 66kV CHW2204 - Installation of Inter Array HV Cables.
Description: 66kV power cables installation work.
Status: Completed 
Location: Windfarm Platform  66kV CHW2204 PJT.

LS Buildwin Ltd  Jul 2024 – Sep 2024
Project: 230kV CHW2204 PJT. 
Description: 230kV power cables installation work.
Status: Completed
Location: Windfarm Platform  230kV CHW2204 PJT.

Taihan Electric Co., Ltd  Dec 2023 – Sep 2024
Project: NDC358 A2. 
Description: 230kV power cables installation work.
Status: Completed
Location: Divert existing Jurong Island – Tembusu 230kV circuit No.2 to Keppel Sakra Cogen to form Jurong Island – Keppel Sakra Cogen 230kV circuit No.1.

LS Buildwin Ltd  Mar 2023 – Aug 2025
Project: SP POWERASSETS NDC342 Route A.
Description: 230kV power cables installation work.
Status: On-going
Location: Labrador to Seraya F1 & F2 230kV Double Circuit 5km.

JEL Maintenance Pte Ltd  Oct 2023 – Dec 2024
Project: 400kV Cable Pulling Works for OCGT 400kV power cables installation work.
Status: Completed
Location: Installation of 400kV cables from Transformer Generator to GIS.

LS Buildwin Ltd  Oct 2023 – May 2025
Project: 22kV & 66kV
Description: 22kV & 66kV.
Status: Completed
Location: Installation of Power Cables for  75MVA Power.

SP PowerAssets Ltd  Apr 2023 – Mar 2025
*Full Turnkey – Design, Supply and Install and Commission
Project: SP POWERASSETS NDC339 Route A
Description: 66kV power cables installation work.
Status: Completed
Location: Diversion of 66kV cables at Admiralty Road West Substation.

Keppel Fels Ltd  Jul 2022 – Nov 2022
Project: Cable Laying works in Offshore Substation at Keppel FELS yard.
Description: 320kV HVDC & 66kV HVAC power cables installation work.
Status: Completed
Location: Platform Dolwin Epsilon.

SP PowerAssets Ltd Feb 2022 – Oct 2025
*Full Turnkey – Design, Supply and Install and Commission
Project: SP POWERASSETS NDC339 Route A.
Description: 66kV power cables installation work.
Status : On-going
Location: Loop in/out 1x66kV Choa Chu Kang to Jurong East
into Bukit Batok Substation and Diversion of 66kV cables at Bukit Batok Substation.

LS Buildwin Ltd Oct 2022 – Jun 2025
Project: SP POWERASSETS NDC311 Route A & B.
Description: 230kV power cables installation work.
Status: On-going
Location: Diversion of 230kV cables at Labrador Underground Substation.

Taihan Electric Co., Ltd Feb 2022 – Jun 2024
Project: SP POWERASSETS NDC319 Route A.
Description: 400kV power cables installation work.
Status: On-going
Location: West Jurong Island ~ SLNG 400kV Double Circuit 6km.

Iljin Electric Co., Ltd Oct 2021 – Oct 2023
Project: SP POWERASSETS NDC309 Route A.
Description: 400kV power cables installation work.
Status: Completed
Location: Choa Chu Kang New Town ~ Bukit Batok 66kV Single Circuit 7km.

Wee Guan Construction Pte Ltd Feb 2021 – Dec 2022
Project: SP POWERASSETS NDC265 Route W3D.
Description: 66kV power cables installation work.
Status: On-going
Location: Choa Chu Kang ~ NTU 66kV Single Circuit 6km.

LS Buildwin Ltd Mar 2021 – May 2021
Project: Cable Laying works in Offshore Substation at Keppel FELS yard, Singapore for TWN Orsted CHW 01/02a 230kV Export Cable Project.
Description: 66kV power cables installation work.
Status: Completed
Location: Windfarm Platform CHW01 and CHW02a – Total 211 length of cables.

SP PowerAssets Ltd Jan 2019 – Dec 2019
*Full Turnkey – Design, Supply and Install and Commission
Project: SP POWERASSETS NDC267 Route B.
Description: 66kV power cables installation work.
Status: Completed
Location: West Coast ~ NUS 66kV 66kV Single Circuit 6km.

SP PowerAssets Ltd Feb 2019 – Feb 2020
*Full Turnkey – Design, Supply and Install and Commission
Project: SP POWERASSETS NDC253 Route N.
Description: 66kV power cables installation work.
Status: Completed
Location: Upper Jurong ~ Google 66kV Triple Circuit 1.8km.

Iljin Electric Co., Ltd Dec 2018 – Dec 2020
Project: SP POWERASSETS NDC237 Route D1 & D2.
Description: 230kV power cables installation work.
Status: Completed
Location: Senoko ~ Woodland Ave 8 230kV Double Circuit 1.8km.

Iljin Electric Co., Ltd
Dec 2018 – May 2022
Project: SP POWERASSETS NDC237 Route A.
Description: 230kV power cables installation work.
Status: On-going
Location: Senoko ~ Admiralty Road West 230kV Double Circuit 1.8km.

Prysmian Powerlink Aug 2018 – Dec 2020
Project: SP POWERASSETS NDC237 Route A.
Description: 230kV power cables installation work.
Status: Completed
Location: Paya Lebar ~ Rangoon 230kV Double Circuit 7km.

LS Cable & System Ltd Dec 2018 – Dec 2021
Project: SP POWERASSETS Contract No. 9180322.
Description: 400kV power cables installation work Term Contract.
Status: On-going
Location: Various Locations.

WORKHEAD AND CERTIFICATION

Integrate Engineers currently has following BCA workheads :

✅ Civil Engineering (CW02) - Grade C3

✅ Cable/Pipe Laying & Road Reinstatement (CR07) - Grade L1.

✅ Electrical Engineering (ME05) - Grade L3

✅ Electrical & Electronic Materials, Products & Components - Grade L6

✅ Minor Construction Work

In addition, Integrate Engineers has achieved Bizsafe Star, ISO 9001 and ISO 45001

ASSETS AND RESOURCES

Manpower

Integrate Engineers currently has over 220 employees. (Inlcuding 3 Project Managers,11 Project Engineers, 8 Site Coordinators, 16 Supervisors and 8 Safety Coordinators.)

Vehicles/ Machineries

Integrate Engineers has 4 Tipper Lorries, 2 Self-loader Lorries with Crane, 11 14ft Lorries, 5 10ft Lorries, 1 Self-loader, 1 Lorry Crane, 5 Electric Van, 18 Excavators, 5 Air Compressor, 3 Forklifts, 40 Cable Hauling Machine, 10 Cable Feeder Machines, 10 Cable Transporters, 1 Hydraulic Cable Cutter, 10 Towerlight, 7 Generators and 7 Air winch.

Cable Pulling Equipment

Integrate Engineers has 40 Cable Hauling Machines, 10 Cable Feeder Machines, 10 Cable Transporters, 5 Air Compressors, 12 Drums of Wire Rope, 6 Air Winch and 300pcs of Steel Deck.

Shoring Materials

Integrate Engineers has 2000 Pieces of Shoring Sheets, 160 Pieces of Steel Plates and 300 Pieces of I beams.

 

Contact us Our Engineers Are Ready to Help!